Construction and Maintenance Projects

Public Works | Ferry Division

Bridge Flap Replacement

The Ferry Division will be replacing the flaps on the Anacortes and Guemes Island bridge aprons October 19 - October 23, 2026.

These are the parts of the bridge at the very end that raise up and down to meet the ferry and help load and unload cars and passengers.

Hydraulic System Replacement

Restoration and preservation of the Anacortes and Guemes Island docks, including full containment, surface preparation, and application of a new protective coating system across all steel elements. 

The project also includes targeted steel repairs, concrete patching from past impact damage, and replacement of aging aprons with newer, modern aprons and flaps.

Guemes Island Ferry Parking Lot Redesign

The Skagit County Public Works Engineering Division is working to redesign the Guemes Island ferry parking lot to ensure the lot is A.D.A. accessible, safe for pedestrian access, and compliant with current stormwater standards.

Anacortes Parking Lot Improvements

The Public Works Ferry Division is working on a redesign of the ferry terminal loading lanes and parking area to improve safety, efficiency, and compliance with the Americans with Disabilities Act (A.D.A.).

Contact Us

Ferry Division Manager
Rachel Rowe

Anacortes Ferry Terminal
500 I Avenue
Anacortes, WA 98221

(360) 416-1466

ferrycomments
@skagitcountywa.gov

Hours
Monday through Friday, 8:00 a.m. to 4:00 p.m.

Please note, our phone number has recently changed. If you call our business office outside business hours, or if there is no answer during business hours, please leave us a voicemail. We return voicemails by the next business day.