Thank you to all that were able to attend in-person or virtually. For those unable to make it and for later reference, here is the material from the meeting.
Handouts provided include
Links from the PowerPoint:
Public Health | Environmental Health
Skagit County Public Health certifications:
Below are links to applications, training, and other resources.
Operations & Maintenance Provider and Pumpers
Following inspection or pumping, certified O&M specialists and certified pumpers must:
(a) Submit an on-site sewage system report to the Health Officer, the property owner and, if applicable, the property buyer, within 30 calendar days following the inspection or pumping; and
(b) Immediately—within seven calendar days—report potential failures to the Health Officer. Submit photo(s) of the potential failure observed when possible.
Installer
Skagit County Certified Installers have the following obligations:
Designers
On-Site Wastewater Designers are certified by the Washington State Board of Registration for Professional Engineers & Land Surveyors (BRPELS). They matches site and soil characteristics with appropriate on-site sewage technology.
Meeting Materials and Newsletter
October 2026 Designer & Installer Industry Meeting
Thank you to all that were able to attend in-person or virtually. For those unable to make it and for later reference, here is the material from the meeting.
Handouts provided include
Links from the PowerPoint: