- Notice of Decision, Published 6/13/2024
- Concrete Norwest SUP and SEPA MDNS Appeal Decision 6/11/24
- Concrete NorWest Index
- Concrete NorWest Bates Numbered (8/23/24)
- Cougar Peak LLC Reconsideration Request PL24-0058
- Central Samish Valley Neighbors Reconsideration Request PL24-0061
- Cougar Peak LLC Appeal PL24-0045
- Central Samish Valley Neighbors Appeal PL24-0064
- Notice of Decision, Concrete NorWest, PL16-0097, PL16-0098, & PL22-0142 (21/2024)
- Hearing Examiners Final Decision (2/1/2024)
- Hearing Examiner Files: September 23, 2022
- Presentation to Hearing Examiner (8/26/22)
- Additional Public Comments Received (8/25/22)
- Comments Received after Notice of Hearing Issued to 7/8/22
- Miles Sand and Gravel : SEPA MDNS Comments
- Miles Sand and Gravel: Reply to Public Comments regarding February 24, 2022 SEPA MDNS Comments (3/18/22)
- Impact Assessment & Mitigation Plan (12/2021)
- Miles Sand and Gravel: Critcal Areas Assessment [45MB] (12/13/21)
- Miles Sand and Gravel: Reply to Washington State Department of Ecology's public comments regarding February 24, 2022
SEPA MONS - Geo-Tech Report: Response to Skagit County Geologic Hazard Requirement (12/16/21)
- Miles Sand and Gravel: Reply to Skagit County PL21-0348 (12/21/21)
Concrete Nor'west Gravel Operation
Planning and Development Services
Concrete Nor'west has proposed a gravel mine operation near Grip Road. Gravel will be removed from the site by truck and trailer and transported to market or one of Concrete Nor'west's nearby facilities for processing. The site is accessed from Grip Road on an existing private gravel road. The subject site is located within the Rural Resource-Natural Resource Land zone and within the mineral resource overlay.
Documents related to Concrete Nor'west Land Use Applications
Agreed Record Before the Hearing Examiner
Special Use Permit Application PL 16-0097
Documents related to the Appeal PL18-0200 can be located here.
Concrete Nor'west has proposed a gravel mine operation near Grip Road. Gravel will be removed from the site by truck and trailer and transported to market or one of Concrete Nor'west's nearby facilities for processing. The site is accessed from Grip Road on an existing private gravel road. The subject site is located within the Rural Resource-Natural Resource Land zone and within the mineral resource overlay.
Submit comments via our webform at PDS Comments.
Unless otherwise specified, dates in parenthesis represent the document’s own date, not the Department’s date of receipt.
- Complete Beacon Plan
- Private Internal Road Asbuilt
- Reply to Washington State Department of Ecology’s public comments regarding February 24, 2022 SEPA MDNS (3/18/22)
- Reply to Public Comments regarding February 24, 2022 SEPA MDNS Comments (3/18/22)
- Public Comments Received -2022 Issued SEPA MDNS
- Agency & Department Comments Received -2022 Issued SEPA MDNS
- Issued Mitigated Determination Of Nonsignificance SEPA MDNS + Checklist (2/24/2022)
- Notice of withdraw of the SEPA MDNS (4/15/2021)
- Notice of Withdrawn and Reissued Mitigated Determination of Nonsignificance (MDNS) (4/15/2021)
- Comment letters (Posted 5/10/21): Received Online | Mailed in | Received via email
- Comment from Wallace Groda received 2/21/21
- Comment from Wallace Groda received 2/4/21
- Comments on SEPA received 11-24-20
- Comment Letters
- Fish and Wildlife, and Water Quality, November 2020
- Applicant Submittal (October 8, 2020)
- Cover Letter
- Grip Road Mine Traffic Impact Analysis
- Grip Road Beacon Plan Sheet 1
- Grip Road Beacon Plan Sheet 2
- Grip Road Beacon Plan Sheet 3
- Grip Road Beacon Plan Sheet 4
- Grip Road Access Plan
- Grip Road Access Plan
- Fugitive Dust Control Plan (Posted 4/4/22)
- Site Plan & Reclamation Maps (Posted 4/4/22)
- Comments received through May 25, 2020 (January 1, 2019 – May 25, 2020)
- Video: Central Samish Valley Neighbors Forum (Recorded June 10, 2020)
- Concrete Nor’West Documents submitted to Planning and Development Services from January 1, 2019 to June 1, 2020.
- HDR Memorandum: Grip Road Gravel Pit Traffic Impact Analysis by County Staff (May 14, 2020)
- HDR Memorandum: Grip Road Gravel Pit Traffic Impact Analysis by Applicant (April 28, 2020)
- DN Traffic Memorandum (April 13, 2020)
- Hearing Examiner's Ruling on Appeal (October 17, 2019)
- Updated Noise and Vibration Study (October 7, 2019)
- CNW Technical reports and addendum list (August 16, 2019)
- Prosecutor's office letter to Hearing Examiner (August 7, 2019)
- Hearing Examiner Revised Schedule (August 7, 2019)
- CNW Supplemental SEPA checklist Information (August 2, 2019)
- CNW (Lynn) letter to Hearing Examiner (August 1, 2019)
- CNW (Semrau Engineering & Surveying) Additional Response letter (June 21, 2019)
- CNW Alternative Road Standard Request (June 14, 2019)
- Hearing Examiner Memorandum (May 22, 2019)
- CNW (Lynn) letter to Hearing Examiner (May 17, 2019)
- Prosecutor's office letter to Hearing Examiner (May15, 2019)
- CNW (Lynn) letter to Prosecutor's office (April 25, 2019)
- Hearing Examiner Memorandum (March 29, 2019)
- CNW (Lynn) Letter to Hearing Examiner (March 22, 2019)
- CNW (Lynn) letter to Prosecutor's office (February 27, 2019)
- Procecutor's office letter to CNW (Lynn) (February 22, 2019)
- CNW (Lynn) letter to Prosecuter's office (January 29, 2019)
- Concrete Nor’Wests revised response package to PDS request for additional information (received December 7, 2018)
- Revised cover letter (December 7, 2018)
- Revised application narrative (August 2, 2018)
- Updated Noise and Vibration study (November 21, 2018)
- Concrete Nor’wests response package to PDS request for additional information (received September 17, 2018)
- Cover Letter (September 14, 2018)
- Revised Application Narrative (August 2, 2018)
- Drawings indicating a 300 foot buffer from the Samish River (July 31, 2018)
- Updated Noise and vibration study (July 18, 2018)
- Site Management Plan (received September 17, 2018)
- Private Internal Road As-Built drawings (September 13, 2018)
Previously submitted documents included in the this submittal
- Cultural Resource assessment (March 9, 2017)
- Grip Mine Fugitive Dust Control Plan (March 2016)
- Traffic Addendum report (November 30, 2016)
- Fish and Wildlife Site Assessment (August 20, 2015)
- Samish River OHWM (May 18, 2015)
- Fish and Wildife addendum (April 18, 2017)
- Hydrogeologic Site Assessment (August 21, 2015)
- Comments received through December 31, 2018 (September 7 – December 31, 2018)
- Comments received through September 6, 2018 (June 2, 2018 – September 6, 2018)
- Comments received through June 1, 2018 (April 1, 2018 – June 1, 2018)
- Denial of application for Failure to Timely Submit the Requested Information (Dated April 5, 2018)
- Notice of Decision (Issued April 10, 2018)
- Comments received through March 31, 2018 (February 1, 2018 – March 31, 2018)
- Concrete Nor’west’s response package to PDS request for additional information (received February 23, 2018).
- Cover letter (February 23, 2018)
- Noise and Vibration study (February 20, 2018)
- Amended Sand & Gravel General Permit (received February 23, 2018)
- Samish River Ordinary High Water Mark/Wetland Edge (May 18, 2015)
- Amended special use permit form (received February 23, 2018)
- Comments received through January 31, 2018 (January 1, 2018- January 31, 2018)
- Comments received through December 31, 2017 (June 8, 2017- December 31, 2017)
- Concrete Nor’West Letter to PDS (November 21, 2017)
- County’s Response to Concrete Nor’West’s September 21, 2017 Letter (October 24, 2017)
- Concrete Nor’west response to PDS request for additional information (received September 21, 2017)
- Environmental protection plan (received September 21, 2017)
- Response to Concrete Nor'West May 15, 2017 Letter (PL16-0097) (July 6, 2017)
- Concrete Nor’west response package to PDS request for additional information (received May 16, 2017)
- Cover letter (May 15, 2017)
- Addendum to Fish and Wildlife site assessment (April 18, 2017)
- Bridge Load Rating memorandum (April 13, 2017)
- Addendum to Traffic Analysis, Maximum Daily Truck Traffic (November 30, 2016)
- Sand & Gravel General Permit (February 17, 2016)
- Concrete Nor'west (Trillium) Timber Management Plan (November 5, 2009)
- Cultural Resources Assessment (March 9, 2017)
- Comments received through June 7, 2017 (April 19 - June 7, 2017)
- Comments received through April 8, 2017 (March 8 - April 18, 2017)
- Application Status Letter (March 15, 2017)
- Letter from PDS to Concrete Nor’West requesting more information (March 14, 2017)
- Comments received through March 7, 2017 (February 5 - March 7, 2017)
- Comments received through February 3, 2017 (January 23 - February 3, 2017)
- Comments received through January 23, 2017 (January 23, 2017)
- Notice of Development Application (published December 15, 2016)
- Planning & Development Services Staff Report (September 12, 2016)
- Letter from WA State Department of Ecology (June 1, 2016)
- SEPA Mitigated Determination of Non-Significance (May 26, 2016)
- Letter of Completeness (received March 7, 2016)
- Special Use Permit Application PL16-0097 (received March 7, 2016)
- Application PL16-0097 (March 7, 2016)
- SEPA Checklist (March 2, 2016)
- Preliminary Traffic Information Plan (February 8, 2016)
- Hydrology Assessment (August 21, 2015)
- Graham-Bunting Associated Fish and Wildlife Site Assessment (August 20, 2015)
Appeal PL18-0200 was filed for application PL16-0097.
Agreed Record Before the Hearing Examiner
- Appeal – filed April 16, 2018
- Skagit County Motion for Summary Judgement – 10-09-19
- Declaration of Julie Nicoll – 10-9-19
- Exhibit 1: County’s Denial of Application
- Exhibit 2: County Letter to CNW dated 3-14-17
- Exhibit 3: Concrete NorWest Response
- Exhibit 3: Addendum to Fish and Wildlife Assessment
- Exhibit 3: Bridge Load Memo
- Exhibit 3: Cultural Resources Assessment
- Exhibit 3: Sand and Gravel Permit
- Exhibit 3: Timber Management Plan
- Exhibit 3: Traffic Analysis Memo
- Exhibit 4: Letter to Concrete NW dated 7-6-17
- Exhibit 5: Concrete NW Letter dated 9-20-17
- Exhibit 5: Environmental Protection Plan
- Exhibit 6: Letter to Concrete NW dated 10-24-17
- Exhibit 7: Letter from Concrete NW dated 11-21-17
- Exhibit 8: Letter from Concrete NW dated 2-23-18
- Exhibit 8: Amended Sand and Gravel Permit
- Exhibit 8: Amended Special Use Permit
- Exhibit 8: Noise and Vibration Study
- Exhibit 8: Samish River (Ordinary High Water Mark Wetland Edge)
- Exhibit 9: Appeal Request
- Concrete Nor’west/Miles Sand and Gravel’s Response to Motion for Summary Judgement dated 10-16-19
- Addendum to response dated 10-16-19
- Declaration of Dan Cox dated 10-16-19
- Hearings Examiner Ruling on Appeal PL18-0200 dated 10-17-19
PL21-0348 : Appeal to PL16-0097/98
Determination of Need to Complete Standard Areas Review
- Miles Reply Brief - Filed 8/11/21
- Declaration of Dan Cox - Filed 8/11/21
- Appeal – Filed 6/17/ 2021
- Skagit County Response to Appeal – Filed 7/28/21
- Exhibits
- Exhibit 1 - Application
- Exhibit 3 - First MDNS
- Exhibit 4 - Ammended Narrative
- Exhibit 5 - Cover Letter in Response to Request for Information
- Exhibit 6 - Traffic Impact Analysis
- Exhibit 7 - Second MDNS
- Exhibit 8 - Withdraw of MDNS
- Exhibit 9 - Public Comments
Agreed Record Before the Hearing Examiner
A Series (Zip File)
- A-1 Notice of SEPA appeal.pdf
- A-2 CSVN SEPA cmts (11-24-2020).pdf
- A-3 Bray-Day MDNS ltr (4-29-2021).pdf
- A-4 CSVN MDNS ltr (3-9-2022).pdf
- A-5 Loring Advising ltr (4-30-2021).pdf
- A-6 Loring Advising ltr (2-7-2022).pdf
- A-7 Loring Advising ltr (3-9-2022).pdf
- A-8 Grip Road Gravel Mine Permitting Timeline.pdf
- A-9 J Day correspondence re trip numbers (3-2022).pdf
- A-10 Haul Route Maps.pdf
- A-11 Truck w Trailer descending Grip Rd Hill.mp4
- A-11 Video clip of truck with trailer descending Grip Road hill.pdf
- A-12 Truck descending Grip w Cyclists.mp4
- A-12 Video clip of truck descending Grip Rd w cyclists.pdf
- A-13 Horse trailer Grip Road.mp4
- A-13 Video clip of horse trailer negotiating Grip Rd curves.pdf
- A-14 Undermined Grip Rd.pdf
- A-15 Water over Grip Rd.pdf
- A-16 Truck at Prairie-Grip intersection.mp4
- A-16 Video clip of truck at Grip Rd and Prairie Rd intersection.pdf
- A-17 Prairie Rd ROW N of Intersection w Grip.pdf
- A-18 Bank reduction Prairie-Grip intersection.pdf
- A-19 Prairie-F&S Grade intersection.pdf
- A-20 Truck w Trailer at Prairie-F&S Grade Intersection.mp4
- A-20 Video clip of truck with trailer at intersection of Prairie Rd and F&S Grade Rd.pdf
- A-21 Prairie Road Guard Rail GMaps Aerial.pdf
- A-22 Cyclists on Prairie.mp4
- A-22 Video clip of truck passing cyclists on Prairie Rd.pdf
- A-23 Curves Prairie E of Old 99 aerial.pdf
- A-24 Truck-pup vehicle paths.pdf
- A-25 Old Hwy 99-Prairie Rd-Bow Hill Rd intersection.pdf
- A-26 Map of route east of mine.pdf
- A-27 Truck and Trailer Grip Rd to E of mine.mp4
- A-27 Video clip of truck and trailer east of mine entrance on Grip Rd.pdf
- A-28 Tilghman transp rprt.pdf
- A-29 Skagit County Bicycle Map.pdf
- A-30 McLoud statement.pdf
- A-31 TIA for Grip Rd Mine.pdf
- A-32 Internal haul rd expansion maps.pdf
- A-33 Mahaffie critical areas report.pdf
- A-34 J Cooper ltr re 300 ft buffer (7-6-17).pdf
- A-35 Oregon Spotted Frog critical habitat map.pdf
- A-36 Gresham cmts (4-7-2016).pdf
- A-37 Gresham cmts (6-1-2016).pdf
- A-38 Gresham cmts (12-23-2016).pdf
- A-39 Luerkens cmts (3-11-3022).pdf
- A-40 Bartelt Timber Mgmt Plan.pdf
- A-41 WDNR FPA Lisa Inc (4-5-2018).pdf
- A-42 WDNR FPA Lisa Inc (8-27-2015).pdf
- A-43 Wiggins, CNW CA Review (11-24-2020).pdf
- A-44 Semrau map with 300 ft buffer.pdf
- A-45 GB Fish&Wildlife Assmt (2015).pdf
- A-46 GB Fish&Wildlife Addendum (2017).pdf
- A-47 GB OHWM ltr (5-18-2015).pdf
- A-48 NWES Impact Assmt.pdf
- A-49 NWES delineation (Dec 2021).pdf
- A-50 McShane haul rd geo rprt.pdf
- A-51 Semrau Internal Rd As Built (9-13-2018).pdf
- A-52 AES GeoTech Rprt.pdf
- A-53 Grip Rd Noise & Vibr rprt revised (11-21-2018).pdf
- A-54 SRSC ltr re ConcreteNorWest gravel pit.pdf
- A-55 Tilghman Resume 2021.pdf
- A-56 Mahaffie resume.pdf
- A-57 McShane CV Geology Hazards.pdf
- A-58 Kammer CV.pdf
- A-59 ECY App 8-C buffer guidance.pdf
- A-60 5 Photos re Road Shoulder.pdf
- A-61 Email RE_ traffic impacts.pdf
- A-62 Resolution 17930 Skagit County Road Standards 2000.pdf
B Series (Zip File)
- B-1 PL16-0097 application.pdf
- B-2 SEPA checklist 3-02-2016.pdf
- B-3 Concrete NorWest Preliminary Traffic Information.pdf
- B-4 Hydro Assessment 8-21-15 Grip Road.pdf
- B-5 Fish and Wildlife 8-20-2015.pdf
- B-6 FPA Concrete Norwest.pdf
- B-7 letterofcompleteness.pdf
- B-8 MDNS-PL16-0097.pdf
- B-9 Grip Road gravel mine-Ecology letter.pdf
- B-10 PL16-0097 Staff report.pdf
- B-11 Notice Dev App 12-15-2016.pdf
- B-12 Letter to Concrete NW031417.pdf
- B-13 Concrete NorWest response 051517.pdf
- B-14 Adendum fishandwildlife.pdf
- B-15 bridgeload.pdf
- B-16 trafficanalysis max truck 11-30-2016.pdf
- B-17 sandandgravelpermit.pdf
- B-18 timbermanagement.pdf
- B-19 Cultural Resource Assessment.pdf
- B-20 responsePDS070617.pdf
- B-21 CNW 9-20-2017 Reply to Skagit County.pdf
- B-22 Environmental Protection Plan.pdf
- B-23 CNW 10 24 17 letter.pdf
- B-24 9-20-2017 Reply to Skagit County.pdf
- B-25 Cover Letter 2018-02-23.pdf
- B-26 Noise and Vibration.pdf
- B-27 NPDES Gravel Mine Permit.pdf
- B-28 Samish OHWM 2015-05-18.pdf
- B-29 AMEND SUP FORM.pdf
- B-30 Concrete Norwests response Cover letter.pdf
- B-31 Narrative Aug 2 2018.pdf
- B-32 Alt 300 foot buffer dwgs.pdf
- B-33 MilesGripRdMine_NoiseReport_Revised07182018.pdf
- B-34 Site Mgmt Plan DOE Permit.pdf
- B-35 Private Internal Road As Built.pdf
- B-36 Grip Mine Fugitive Dust Control Plan.pdf
- B-37 2018 12 07 letter to J Nicoll.pdf
- B-38 2018 12 07 Special Use Narrative.pdf
- B-39 MilesGripRdMine_NoiseReport_Updated112118.pdf
- B-40 Lynn letter to Nicoll January 29 2019.pdf
- B-41 Nicoll letter to Lynn February 22 2019.pdf
- B-42 Nicoll letter to Lynn February 22 2019.pdf
- B-43 Lynn Letter to Hearing Examiner March 22 2019.pdf
- B-44 Hearing Examiner Memorandum March 29 2019.pdf
- B-45 Lynn letter to Nicoll April 25 2019.pdf
- B-46 Nicoll letter to Hearing Examiner May15 2019.pdf
- B-47 Lynn letter to Hearing Examiner May 17 2019.pdf
- B-48 Hearing Examiner Memorandum May 22 2019.pdf
- B-49 Additional Response letter June 21 2019.pdf
- B-50 Traffic Summary 6-11-19.pdf
- B-51 Revised 200 and 300 buffer plans.pdf
- B-52 Vicinity Map-C0.pdf
- B-53 Alternative Road Standard Request June 14 2019.pdf
- B-54 Supplemental SEPA checklist information 2019.pdf
- B-55 Pl18-0200 Lynn letter to Hearing Examiner August 1 2019.pdf
- B-56 Technical reports and addendum list August 16 2019.pdf
- B-57 Updated Noise and Vibration Study October 7 2019.pdf
- B-58 Pl18-0200 HE-Ruling on Appeal.pdf
- B-59 DN Traffic Consultants Memo.pdf
- B-60 HDR Memorandum Grip Road Gravel Pit Traffic Impact Analysis by Applicant.pdf
- B-61 HDR Memorandum Grip Road Gravel Pit Traffic Impact Analysis by County Staff.pdf
- B-62 CoverLetter 2020-10-08.pdf
- B-63 Grip Road Mine TIA Final.pdf
- B-64 GripRdBeaconPlan-Sht01.pdf
- B-65 GripRdBeaconPlan-Sht02.pdf
- B-66 GripRdBeaconPlan-Sht03.pdf
- B-67 GripRdBeaconPlan-Sht04.pdf
- B-68-GripRdAccessPlan-RVS-Sht10.pdf
- B-69 -GripRdAccessPlan-RVS-Sht03.pdf
- B-70 Issued SEPA MDNS & Checklist PL16-0097.pdf
- B-71 Agency and Department Comments Received -2022 Issued SEPA MDNS.pdf
- B-72 Public Comments Received -2022 Issued SEPA MDNS.pdf
- B-73 Miles MDNS Reply to Public Comments 2022-03-18.pdf
- B-74 Mile Reply to DOE Comments.pdf
- B-75 Private Internal Road Asbuilt.pdf
- B-76 Complete Beacon Plan.pdf
- B-77 Miles Reply to Skagit County 12212021.pdf
- B-78 Miles Sand and Gravel CAA Complete 121321.pdf
- B-79 Impact Assessment Mitigation Plan.pdf
- B-80 Geo-Tech Report PL21-0348 12162021.pdf
- B-81 Miles Reply to Public Comment.pdf
- B-82 MDNS Comments 2022-03-11.pdf
- B-83 Site and Reclamamtion Maps.pdf
- B-84 Matthew Miller_Gravel Mine Resume_2022.pdf
- B-85 John B Semrau Resume.pdf
- B-86 NES SOQ 2022.pdf
- B-87 Margaret Berger CV.pdf
- B-88 Kristen Wallace Resume.pdf
- B-89 Ryan Ransavage Resume.pdf
- B-90 Jay Chennault_Gravel Mine Resume_2022.pdf
- B-91 Chuck Lindsay_Gravel Mine Resume_2022.pdf
- B-92 Graham Bunting SOQ.pdf
- B-93 Dan Cox Vicinity Map.pdf
- B-94 Vicinity Map-C0 markup.pdf
- B-95 1998DNR Aerial.pdf
- B-97 Top of Bank 25 Buffer.pdf
- B-98 Walsh Title Notification 201504280103.pdf
- B-99 2020.01.06 - Inclement Weather Planning.pdf
- B-100 Applicant's Voluntary Special Use Permit Conditions.pdf
C Series (Zip File)
- C-1 Staff Report.pdf
- C-1 SUP Staff Report.pdf
- C-2 GIS Images & Assessor's Parcel Infomation.pdf
- C-3 SUP Application, Narrative, & SEPA.pdf
- C-4 OHWM Determination.pdf
- C-5 Fish & Wildlife Assessment.pdf
- C-6 Fish & Wildlife Report -Addendum.pdf
- C-7 Semrau 300 Foot Buffer Drawings.pdf
- C-8 Grip Rd Critical Area Assessment & Impact Assessment & Mitigation Plan.pdf
- C-9 Hydro Geological Site Assessment.pdf
- C-10 Geo-Tech Report Haul Road.pdf
- C-11 Cultural Resource Report.pdf
- C-12 Preliminary Traffic Information.pdf
- C-13 Maximum Daily Traffic, Traffic Addendum.pdf
- C-14 DN Traffic Consultants Memo.pdf
- C-15 GTC review of DN Traffic Consultants TIA.pdf
- C-16 HDR Third Party Review.pdf
- C-17 Semrau Additional Info Request Letter.pdf
- C-18 Traffic Impact Analysis 9-10-20.pdf
- C-19 Private Internal Road Asbuilt.pdf
- C-20 Janicki bridge rating letter.pdf
- C-21 DCG Bridge Load Rating Memo.pdf
- C-22 Fugitive Dust Control Plan.pdf
- C-23 Timber Management Plan.pdf
- C-24 Updated Noise & Vibration Study.pdf
- C-25 Site Mgmt Plan DOE Permit-final.pdf
- C-26 General Permit, NPDES, Waste Discharge Permit.pdf
- C-27 Issued SEPA MDNS 2-22-2022.pdf
- C-28 NOA.pdf
- C-29 List of Landowners within 300 Feet.pdf
- C-30 Notice of Hearing.pdf
- C-31 COMBINED LIST OF PARTIES OF RECORD OF PROJECT FROM 2016 TO 6-8-2022.pdf
- C-32 GIS Map of Subject Parcels.pdf
- C-33 Public Comments 2016 thru 2021.pdf
- C-34 Public Comments Received During 2022 SEPA MDNS comment period (2).pdf
- C-35 Public Comments Received 2022 Before SEPA MDNS.pdf
- C-36 Public Comments Received 2022 After SEPA MDNS.pdf
- C-36 Site Plan & Reclamation Maps.pdf
- C-37 Agency & Department Comments Received 2016 to end of 2021.pdf
- C-38 Agency & Department Comments Received in 2022.pdf
- C-39 Applicants Response to Comments Received.pdf
- C-40 Site Plan & Reclamation Maps.pdf
- C-41 Appeals.pdf
- C-42 Site Visit Photos.pdf
- C-43 Complete Beacon Plan.pdf
- C-44 MDNS 5-26-2016.pdf
- C-45 Notice of Withdrawn & Re-Issued MDNS 4-15-2021.pdf
- C-46 Withdrawal of MDNS 5-13-2021.pdf
- C-47 SEPA Staff Report.pdf
- C-48 Additional Public Comments Received -Reduced.pdf
- C-49_S-1 Neil McLeod Letter and Attachments.pdf
- C-49_S-10 Citizen Letter School Bus from 8-26-2022 written testimony exhibits 1-10.pdf
- C-49_S-11 Code CP Illustrative Exhibit Screen Skagit County Code Excerpts re Mining Special Use Permit.pdf
- C-49_S-12 4.08, 4.09 Road Standards.pdf
- C-49_S-13 Markup of Applicant's Truck Length Exhibit New Applicant KWNW 5x3 Train Layout.pdf
- C-49_S-14 Table B-6 from Exh 18 Sept 10, 2020 Norris Traffic.pdf
- C-49_S-15 Truck Width With Mirrors Truck specifications.pdf
- C-49_S-16 Signed Wallace Groda Declaration Sept. 30, 2022-1.pdf
- C-49_S-17 Ehrlichman Declaration and Exhibits.pdf
- C-49_S-1A Map Neil McLeod Grip Road.pdf
- C-49_S-1B Photo N McLeod No Shoulder Westward Grip Road.pdf
- C-49_S-1C Road Widths Grip Road.pdf
- C-49_S-2 Comp Plan Goals Policies Grip Road.pdf
- C-49_S-3 SKAGIT COUNTY CODE.pdf
- C-49_S-4 POLICY 4d-5.3.pdf
- C-49_S-5 TIA Excerpt Grip Road Conditions.pdf
- C-49_S-6 2017 2018 Traffic Counts Grip Road.pdf
- C-49_S-7A Road Standards Title Page, Resolution and Table of Contents.pdf
- C-49_S-7B Excerpts Road Standards re Safety.pdf
- C-49_S-7C Road Standards Level II Requirements from Appendix A Traffic Study Road Standards v.5.2.pdf
- C-49_S-8 March 7 2016 Application Complete per Letter March 22 2016 Grip Mine PDS.pdf
- C-49_S-9 Bus Schedule Sedro Wooley.pdf
- C-50 HE Presentation.pdf
- C-51 CSVN proj cmts PL16-0097 & PL16-0098 w attchs.pdf
- C-52 (MSG) Crash History.pdf
- C-53 (MSG) Autoturn Analysis.pdf
- C-54 KWNW 5x3 Train Layout.pdf
- C-55 (MSG) Dump Truck and Pup 1.pdf
- C-56 Ordinance 20080014.pdf
- C-57 CAO-Deter-FINAL-2021-06-16.pdf
- C-58 List of speakers and written material from public testimony hearing.pdf
- C-59 Notice of Hearing 080322.pdf
- C-60 Tilghman Declaration_Cougar Peak 24.08.21.pdf
- C-61 Tilghman Declaration_CSVN 24.08.12.pdf
P Series (Zip File)
- P1 CSVN Notice of Appeal 22.03.25.pdf
- P2 Order on Pre-Hearing Conference 22.04.01.pdf
- P3 CNW Opposition to Motion to Intervene 22.04.12.pdf
- P4 CP Motion to Intervene 22.04.12.pdf
- P5 County Response to Motion to Intervene 22.04.22.pdf
- P6 Pre-Hearing Orders - SEPA 22.05.13.pdf
- P7 Decision on Intervention 22.05.13.pdf
- P8 CNW Document List 22.06.13.pdf
- P9 Miles Witness List 22.06.13.pdf
- P10 CSVN Witness & Exhibit lists 22.06.13.pdf
- P11 CSVN Amended Witness & Exhibit lists 22.06.13.pdf
- P12 County Exhibit and Witness List 22.06.13.pdf
- P13 Corrected County Exhibit and Witness List 22.06.13.pdf
- P14 CP Letter to HX re Process 22.06.21.pdf
- P15 Joint Motion re County Record 22.06.29.pdf
- P16 CSVN Hearing Brief - SEPA 22.07.01.pdf
- P17 CNW Prehearing Brief - SEPA 22.07.01.pdf
- P18 CP Prehearing Brief - SUP 22.07.01.pdf
- P19 CNW Pre-Hearing Brief - SUP 22.07.07.pdf
- P20 CSVN Hearing Brief - SUP 22.07.08.pdf
- P21 County Amended Exhibit & Witness List 22.08.03.pdf
- P22 CP Supplement to Prehearing Brief 22.08.25.pdf
- P22 S-1A Map Neil McLeod Grip Road.pdf
- P22 S-1B Photo N McLeod No Shoulder Westward Grip Road.pdf
- P22 S-1C Road Widths Grip Road.pdf
- P22 S-2 Comp Plan Goals Policies Grip Road.pdf
- P22 S-3 SKAGIT COUNTY CODE.pdf
- P22 S-4 POLICY 4d-5.3.pdf
- P22 S-5 TIA Excerpt Grip Road Conditions.pdf
- P22 S-6 2017 2018 Traffic Counts Grip Road.pdf
- P22 S-7A Road Standards Title Page, Resolution and Table of Contents.pdf
- P22 S-7B Excerpts Road Standards re Safety.pdf
- P22 S-8 March 7 2016 Application Complete per Letter March 22 2016 Grip Mine PDS.pdf
- P23 CP Response to Motion in Limine 22.08.30.pdf
- P24 CP Letter to HX re Exhibits & Testimony at Hearing 22.09.01.pdf
- P25 CP email to HX re Answers to Procedural Questions 22.09.01.pdf
- P26 Stipulated Facts 22.09.13.pdf
- P27 CP Corrected List of Exhibits 22.09.22.pdf
- P28 CP Conditions and Comment Letter to HX Skagit Co 22.10.07.pdf
- P29 County Closing Brief 22.10.28.pdf
- P30 CSVN Post-Hearing Brief - SUP 22.10.28.pdf
- P31 CSVN Post-Hearing Brief - SEPA 22.10.28.pdf
- P32 CNW Closing Brief 22.10.28.pdf
- P33 CP Posthearing Brief 22.10.31.pdf
- P33-Ex.A CP List of Proposed SUP Conditions 22.10.31.pdf
Transcripts (Zip File)
- 2022-08-26 0900 Permit Hearing.pdf
- 2022-08-26 1240 Permit Hearing.pdf
- 2022-08-29 0900 Permit Hearing.pdf
- 2022-09-02 0900 Permit Hearing.pdf
- 2022-09-02 1130 Permit Hearing.pdf
- 2022-09-02 1300 Permit Hearing.pdf
- 2022-09-08 0900 Permit Hearing.pdf
- 2022-09-08 1100 Permit Hearing.pdf
- 2022-09-08 1330 Permit Hearing.pdf
- 2022-09-08 1500 Permit Hearing.pdf
- 2022-09-09 1500 Permit Hearing.pdf
- 2022-09-09 900 Permit Hearing.pdf
- 2022-09-13 1100 Permit Hearing.pdf
- 2022-09-13 1300 Permit Hearing.pdf
- 2022-09-13 1500 Permit Hearing.pdf
- 2022-09-13 900 Permit Hearing.pdf
- 2022-09-23 1100 Permit Hearing.pdf
- 2022-09-23 1300 Permit Hearing.pdf
- 2022-09-23 1500 Permit Hearing.pdf
- 2022-09-23 900 Permit Hearing.pdf
- Grip Road Hearing Transcripts.zip